.

Friday, April 19, 2019

Tipaimukh Hydro-Electric Project Assignment Example | Topics and Well Written Essays - 3250 words

Tipaimukh Hydro-Electric Project - Assignment Example excessively the submergence may lead to loss of homes, means of subsistence like agricultural, horticultural and even forest lands, where tribal have access to minor produces as well as for jhumming, and naturally will have traumatic effect on the affected population. Under such circumstances, it will be proper to take by the bye steps for planning rehabilitation and resettlement of Project Affected Persons (PAPs) to avoid any further disastrous incidents.Due to varied geomorphic char locomoteer, complex tectonics, structure and soft sediment lithostratigraphy, and change in draw down, the impounded water is bound to cause unstable slope condition, especially in reservoir coast, particularly those in the stipulate of draw down. Thus, in the event of sudden draw down, major slip ones mind could develop. Simultaneously, reservoir water would act as the load drive, as is commonly found in the Himalayan Region, which may have a positive stabilizing influence too. It is and then recommended that ab step forward 100 m above the reservoir edge is thoroughly investigated for site specific companionship on failure mechanism and adequate protection measures, as explained, be planned at the pre-construction arrange with tentative provision of shot crating, rock anchoring, carving out of slopes etc.Landslide activity would generat... eously, reservoir water would act as the load drive, as is commonly found in the Himalayan Region, which may have a positive stabilizing influence too. It is therefore recommended that about 100 m above the reservoir rim is thoroughly investigated for site specific knowledge on failure mechanism and adequate protection measures, as explained, be planned at the pre-construction stage with tentative provision of shot crating, rock anchoring, carving out of slopes etc.Landslide activity would pay off rock boulders, silts and mud, but its effect is again dependent on the distance of occurrence from the project components. If the slide occurs much above the FRL direct impact would be less. However, some slides just at the periphery of the rim would add to the silt load / bed load.This impact on the project could be managed by nab the potential slide zones through suitable engineering treatment measures, afforestation etc. However, the project shall have a separate provision for engineering geological studies to provide necessary treatment measures. observe Gas electric dischargeDuring construction / excavation of underground openings in the project site, emission of explosive gas may be encountered as the lithological sequence to be encountered is of tertiary age. Therefore, its adverse effect of damaging environment during construction plosive speech sound could be mitigated through early monitoring of the quantity and quality & concentration of the gas. For this gas demodulator and protective measures, as per underground construction / mining rule is to be kept and executed strictly. Monitoring of Change in Water QualityProvision for monitoring of change in water quality, both upstream and down stream, should be made.Seismic Risk, Hazard Monitoring and Mitigation

No comments:

Post a Comment